The Highways Agency is carrying out the construction of several road humps in the rise of the Holy to avoid black spots and the extreme speed of vehicles on the road.
These works are undertaken from the Autonomous upon request of the Mayor of Totana, José Martínez Andreo, to undertake that as soon as possible because it is one of the most important commitments that became the first mayor in recent meetings with neighbors of the ponds and gardens.
With the construction of these ridges and the placement of horizontal and vertical signaling, as reported by Martínez Andreo, first, it will reduce the speed of vehicles going up and down to the area of orchards, pond or La Santa.
Source: Ayuntamiento de Totana