The Department of Planning and Sustainable Development has reported that the reclamation works sidewalks and street services in the town Doctor Fleming have already been completed, meeting the deadlines for implementation
In this street has proceeded to the asphalting of the 100 meters in length and which has changed the paving of sidewalks by a new one.
It has also replaced the entire sewer system with a new 315-mm diameter PVC to rush home for the purpose of improving the existing wastewater service.
Similarly, it has been completely replaced by potable water network, currently cement, by a PE of 90 mm in diameter with corresponding rush home.
The total budget for this work, amounting to the amount of 54,001.24 euros, was awarded the Peñalver Ruiz Construcciones, SL
Source: Ayuntamiento de Totana