Portal de Totana

www.portaldetotana.com

Totana - SpanishTotana - English
detail of Totana

 

The last Board headman of this term addresses the latest developments on the handling of PGOM (11/03/2015)

The last Board headman of Totana an ordinary meeting of this legislature addressed the latest information on the handling of the General Municipal Management Plan and sending documentation to the Ministry of Development, Public Works and Planning, and the status of record of the consolidation of irrigation is expected that the Council of Ministers approves.

Subsequently, the needs of the districts so treated was reported to have occurred arrangement Hawthorn Road streetlights and lampposts on the road to Alhama;

and the problem that exists in the parking lot of "Supermarket Macfour" whose parking vehicles sometimes hampers the traffic was also discussed.

About the council of La Huerta theme nomenclature sections of roads with signs indicating (catalog paths) was treated, the problem that exists with the sound of cannons repelling birds to parrales in night hours and the power of clubhouse and the Hermitage.

In addition, several potholes that exist in the Camino del Arco to Los Molejones and are awaiting asphalt treated;

securing several loose containers as a result of wind and placing a pipe in pressure water near the Arch.

Replacing the water line area of ​​Los Molejones (whose implementation is expected soon) and the need to carry out a concrete score Camino de Los Molejones also arises.

In Paretón-Cantareros it is reported that the cafeteria in the "Juana Serrano" Social Centre has been deserted after leaving for bids, so the headman seeks a throw back to tender and to be given information dissemination procedure administrative.

The necessity of solving water sheds, the arrangement of several lampposts near Cantareros, cleaning parks and replacement of dead trees in the park Cantareros and Las Lomas, near the community center arises;

and install a swing in the park "The Sheds Cistern of Los López".

Similarly, reportedly has asked Segura basin channel arrangement, as are asking the neighbors because it is the competent body.

On the basis of Hoya Raiguero Camino Spain and the asphalt of the road from the junction of the Casa El Clerio in Lebor, through the Guadalentín River to Highway Hinojar in The Raiguero is requested;

while it is reported to have already ordered the new mailboxes for the districts of El Raiguero and Lébor.

Source: Ayuntamiento de Totana

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Utilizamos cookies propias y de terceros para facilitar su navegación en la página web, conocer cómo interactúas con nosotros y recopilar datos estadísticos. Por favor, lee nuestra Política de Cookies para conocer con mayor detalle las cookies que usamos, su finalidad y como poder configurarlas o rechazarlas, si así lo considera.