Portal de Totana

www.portaldetotana.com

Totana - SpanishTotana - English
detail of Totana

 

CHS performs dredging the lower reaches of the river Guadalentin in Totana (18/12/2013)

The Segura basin (CHS), an autonomous body under the Ministry of Agriculture, Food and Environment, has started dredging and disposal of sediments from the low-water channel Guadalentin River in the town of Totana.

The work, which has an operating budget of € 58,942, is to remove accumulated during the great flood caused by the flood of St. Wenceslas in late September last year carryover.

The works will affect a stretch of nearly six miles long and foster evacuation of low circulating flow in the area through the stress gradient low-water channel in the central region of the channel, reducing stagnation and proliferation vegetation.

Moreover, non-native vegetation that currently pervades the runway Guadalentin to improve drainage capacity, and proceed to the stabilization and repair of the side slopes damaged by the flood and the consolidation of service road will be deleted.

Source: CHS

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Utilizamos cookies propias y de terceros para facilitar su navegación en la página web, conocer cómo interactúas con nosotros y recopilar datos estadísticos. Por favor, lee nuestra Política de Cookies para conocer con mayor detalle las cookies que usamos, su finalidad y como poder configurarlas o rechazarlas, si así lo considera.