Portal de Totana

www.portaldetotana.com

Totana - SpanishTotana - English
detail of Totana

 

Work begins patching Comprehensive Plan in over 70 streets of the town of Totana (14/06/2013)

The Department of Municipal Infrastructure and Roads this week started work on the Comprehensive Plan called Patch in over 70 streets of the town of Totana, which will last for the next few days, and has a budget of 130,000 euros.

The deterioration of the asphalt as a result of the passage of time, traffic and temporary flooding last September have been many tunnels have proliferated in recent months in many streets of the town and the villages and rural roads network distributed totanero field.

This plan includes three great performances.

The settlement and asphalting works full street Alhama and Glorieta "Alfonso Navarro Martinez", which included an amount of 27,000 euros was undertaken for several weeks, a path that was very poor because it supports access traffic to the neighborhood El Parral and the entry and exit of vehicles from the road to Alhama de Murcia.

It also includes the rehabilitation and patching sign in more than a dozen rural roads for 50,000 euros, and the paving and repair of potholes in streets of El Pareton industrial and "The Salt Marsh, with a budget another 50,000 euros total.

Source: Ayuntamiento de Totana

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Utilizamos cookies propias y de terceros para facilitar su navegación en la página web, conocer cómo interactúas con nosotros y recopilar datos estadísticos. Por favor, lee nuestra Política de Cookies para conocer con mayor detalle las cookies que usamos, su finalidad y como poder configurarlas o rechazarlas, si así lo considera.