Portal de Totana

www.portaldetotana.com

Totana - SpanishTotana - English
detail of Totana

 

The investment of 1.6 million school becomes "Santa Eulalia" and "Tierno Galván" and turns them into buildings of educational excellence (25/01/2011)

The construction of the Parents' School in Santa Eulalia school and new school buildings in the school Summer Tierno Galván with an investment of more than 1,600,000 euros have transformed these two sites and buildings have become excellent education.

The Mayor of Totana, José Martínez Andreo, along with the mayor of Planning, María José Bedia, and the Councillor for Education, Trini Cayuela, visited the works of these two schools, which have been funded through the State Fund for Sustainability and Employment.

Martínez Andreo has explained that these works will improve the quality of life of two separate educational community colleges getting the town of Totana is "excellent quality and having the appropriate infrastructure to the needs of the collective."

In this sense, the mayor pointed out that "despite the bad omens of the opposition" to the legislature have conducted educational infrastructure works that have surpassed the ten million euros and 90 have been complied with percent to the objectives set by the government team betting on educational improvement.

These works of the municipal building for the School of Parents and reform of toilets and the covering of the arena of the school "Santa Eulalia" and the construction of the municipal building for summer schools and the reform of toilets CP "Tierno Galván "finalized in the month of February.

Parent School track covering polideportivpo, Colegio "Santa Eulalia"

As he reminded the mayor of Planning, the merchant "PROMOVALCI 2005 SL is the contractor of the two school plays" Santa Eulalia ", for an amount of around one million euros.

Specifically, the construction of the municipal building for the School of Parents and reform of toilets, have a budget of 327,700 euros to 201,787 euros improvements and implementation within three months, so that after the summer and be completed the next school year 2010-11 will be fully operational.

With the construction of the building of new plant to the Parents' School which is located next to the school, as reported by the mayor, will respond to the demand made by a large proportion of the population of Totana, which been requesting a municipal building for this use, as "a meeting place through dialogue and analysis we try to share different views on topics of educational interest."

Thus, the school aims to provide ground floor of rooms for administrative and rearrangement of toilets, with direct access from the outside and adapted to persons with disabilities engines.

On the other hand, has led to the covering over the existing outdoor sports court, is located on Calle Teniente Pérez Redondo in the corner of Calle Virgen de la Merced.

It is building a metal roof rolled steel pillars in the existing athletics track which is intended to safeguard students at this school for inclement weather in both winter periods and in the summer.

This reform, as reported by the mayor, has led to the modification of the current fencing school, and the reorganization of sports courts, distributing an inside under cover and another was discovered.

Summer School, Tierno Galván

On the other hand, the construction of the municipal building for summer schools and the reform of toilets CP "Tierno Galván" in the town are being implemented by the Commercial UTE "Bachelor SL Components" and "Transfer Building 97 SL"

With the construction of the building of new plant to the Summer School, which is located next to the school, as reported by the mayor of Education, Trini Cayuela, it responds to the commitment of the government team with educational community of this center, who came seeking a building for this use.

The new building is connected to the school through the floor to share the existing lift and included in the same toilets affected reform, and incorporating toilets adapted for people with physical disabilities.

Source: Ayuntamiento de Totana

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Utilizamos cookies propias y de terceros para facilitar su navegación en la página web, conocer cómo interactúas con nosotros y recopilar datos estadísticos. Por favor, lee nuestra Política de Cookies para conocer con mayor detalle las cookies que usamos, su finalidad y como poder configurarlas o rechazarlas, si así lo considera.