Portal de Totana

www.portaldetotana.com

Totana - SpanishTotana - English
detail of Totana

 

The works of the Rambla de La Santa will be inaugurated on Thursday at 20:30 pm (05/07/2010)

The works of the Avenue de la Rambla de La Santa, which are in their last phase of implementation with the asphalting of the road, will be inaugurated on Thursday July 8 at 20:30 pm by municipal authorities.

These works, on both sides of the avenue from the bridge located near the Health Center and to the bridge of the Pilar, have been executed in two projects: on the one hand, part funded through the Plan E 2009 and on the other hand, through the Works and Services Plan 2009.

The works, as the mayor pointed Planning and Sustainable Development, María José Bedia, have involved the demolition of the sidewalk, and replacing the existing pavement, which was completely damaged by precast concrete paving and placement of reinforcement market.

It has also been replaced with third replanting trees over palm trees, brachichitos and orange, giving more shade for pedestrians and better adapted to this climate.

Similarly, street lighting has also been replaced by a more efficient energy saving and fire hydrants were installed, under a grant from the Directorate General of Crafts and Trade, to provide increased security during the celebration of weekly market.

It has also installed a new network of non-potable water irrigation and fire extinguishers have been placed.

Source: Ayuntamiento de Totana

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Utilizamos cookies propias y de terceros para facilitar su navegación en la página web, conocer cómo interactúas con nosotros y recopilar datos estadísticos. Por favor, lee nuestra Política de Cookies para conocer con mayor detalle las cookies que usamos, su finalidad y como poder configurarlas o rechazarlas, si así lo considera.