Portal de Totana

www.portaldetotana.com

Totana - SpanishTotana - English
detail of Totana

 

The General Assembly of COAG ratified the opposition to the PGMO of Totana and the appointment of the new Vice-President (16/11/2016)

Last Thursday, the Union of Farmers and Stockbreeders of Bajo Guadalentín (COAG) celebrated the presentation and approval of both the report for the year 2015 and the balance of that exercise, Both approved unanimously.

The assembly also approved the proposal of the Board of Directors of the organization of a change of functions in the positions of the same, for which Antonio Costa Simón, until now vocal, will become Vice-president of the organization.

The attendees were also informed of the need to comply with the regulations that require the official review of the agricultural machinery, as well as how the situation was the problem of irrigation water, after the various concentrations produced before the headquarters of the Hydrographic Confederation Del Segura (CHS) and the recall of the demonstration to be held in Madrid on 13 October.

The President of the Union, Isidoro Cayuela informed the assembly that the organization and all organizations Cebag, continued to have an opposition to the text of land-use planning (PGMO) of Totana , while urged coach Jose Martinez Usero to briefly explain the state of the situation with respect to the plan, which he did with the support of the projection of an on-screen presentation, which detailed the entire trajectory of the plan in the last 12 years.

At the same time he reported that the last version of the plan approved last July, with the support of the Mayor and the United Left and the opposition of the PSOE, was pending its resolution by the Minister of Urban Planning, after the rectification of the Defects identified by the services of the Ministry.

The aforementioned technician also reported that the text approved by the former PP corporation and now supported by the Mayor and IU, violated most of the agreements and guidelines agreed by all political groups in December 2011, as demonstrated by the Thousands of farms and 9000 hectares had been converted into protected areas and villages, which now required 20,000 m to build a building, which was previously allowed at 5,000 m, and the text sent to Murcia approved that it would be left in Irregular situation and out of order thousands of homes located in 90% of the streets of Totana.

At the end of the assembly most of the attendees shared some drinks and a few tapas of earth products prepared and served by people linked to the organization.

Source: COAG

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Utilizamos cookies propias y de terceros para facilitar su navegación en la página web, conocer cómo interactúas con nosotros y recopilar datos estadísticos. Por favor, lee nuestra Política de Cookies para conocer con mayor detalle las cookies que usamos, su finalidad y como poder configurarlas o rechazarlas, si así lo considera.